SOLD FIRM 506 Queen Elizabeth Drive

The Glebe | Ottawa

$1,695,000

Request A Viewing Contact Us

Along the Canal in the Glebe

The Spaces

MAIN FLOOR

Entrance Foyer - 10.1' x 5.9'

Mud room - 13.1' x 6.7'

Livingroom - 12' x 10.7'

Diningroom - 18.4' x 13.8'

Kitchen - 13.8' x 11.7'

Powder room - 4.8' x 3.3'

Bedroom - 10.2' x 5.8'

Ensuite Bathroom - 10.2' x 5.8'

Mudroom - 13.1' x 6.7'

Yard

SECOND FLOOR

Bedroom - 13.9' x 11.3'

Bedroom - 11.2' x 10.2'

Bathroom - 7.6' x 6.4'

Den - 17.4' x 13.2'

Kitchen - 13.10' x 11.7'

THIRD FLOOR - 21.9' x 20.8'

Familyroom/media room

Laundry room - 6.2' x 4.9'

BASEMENT

Rec room/Media room - 17.6' x 9.7'

Guest room /Bedroom/Office - 12.4' x 10.3'

Full Bathroom - 6.7' x 5.5'

Storage - 17.1' x 12.2'

Workshop - 16.9' x 9.1'

Info & Facts

Bedrooms:4+2 den

Bathrooms:3 full- 1 half

Parking:2

Taxes:$10592

Aug 4, 2017 Dec 4, 2017 Wayne R. Edwards Electrical - removal of old wiring and installation of new wiring, fixtures and three circuit breaker boxes. Aug 4, 2017 Dec 4, 2017 Al-Teck Electrical Inc - of natural gas/diesel powered standby generator and automatic switch over system. Dec 14, 2017 Electrical Safety Authority - Certificate of Inspection Aug 4, 2017 Dec 4, 2017 Austrian Design and Renovation - Removal of plumbing/ heating system/ fixtures/ stairs/ wall partitions/ windows/ most insulation/ basement walls and insulation/ floor. Installation of beams; columns; room partitions; drywall; new spray insulation in ceiling to roof cavities; new bathroom and kitchen fixtures, tiling, cabinets, granite tops, etc; new oak hardwood flooring on all floors; new dryer and bathroom vent systems; dry basement floor system, Nov 2017 Nov, 2017 City of Ottawa - Replace water lead supply pipe with copper supply pipe Aug 4, 2017 Dec 4, 2017 Huntley Plumbing - All new hot and cold water plumbing New 1st and 2nd floor in-floor radiant heat system utilizing the joist track system c/w a NTX 151 Boiler and indirect hot water tank. New 3rd floor low profile radiator system Installation of radiator system in basement Oct 1, 2017 Dec 4, 2017 Embrun HVAC - Installation of Mitsubishi Split Air Conditioning Systems in 1st, 2nd and 3rd floors. Apr 2018 May 2, 2018 London Eco-Metal Mfg. Inc. - New All Steel 55 year warrantee roof on house and garage. Note: To transfer warrantee, new owners have to notify London Eco-Metal Mfg. Inc. in writing within 30 days of taking possession. See actual warrantee document. Nov 17, 2017 Giovannitti Structural Design Inc. - Engineering Report May 1, 2018 Jun 1, 2018 MP Construction Inc. - Rear Deck construction Installation of new soffits and downspouts Oct 2021 Oct 2021 Lalonde Awning - Installation of Retractable Awning 2017 2021 Fence Installation, Reface garage, landscaping

Others Homes in the Neighbourhood


Sorry we are experiencing system issues. Please try again.

Neighbourhood Map

Interested? Let’s Talk.

(613) 296-6708 Email Us